Littleton Board of Health Approves Two Septic Upgrades, Continues Two Others

LITTLETON — April 22, 2026 — Littleton's Board of Health approved two septic upgrade projects and continued two others at its April 22 virtual meeting. The board voted 3-0 to approve a septic system upgrade at 10 Beaver Brook Road for owners Don and Joanne Lyon, accepting a two-foot groundwater offset reduction recommended by engineer Kirk Fitzpatrick of Civil Solutions, and approved a building permit at 100 King Street with a deed restriction for a four-bedroom home after updated plans confirmed one proposed room fell below the seven-foot ceiling threshold. The hearing on 0 Elm Road was continued after board member Kevin Baker cited missing documentation and the board's longstanding resistance to variances on new construction, while a public comment from abutter Kyle Man of 37 Dogwood identified a scale error in the retaining wall plan and a DEP offset of only 7.85 feet against a required 10 feet. The 21 Lake Shore Drive hearing was also continued after Chair Matthew Wason declared a heated, insulated garage "a room" for room-count purposes — a determination that could force the applicant to abandon the proposed basement foundation and redesign the project around a slab.

Keep reading with a 14-day free trial

Subscribe to The Littleton MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Littleton MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Lowell Post · The Malden Post · The Marlborough Post · The Maynard Post · The Medford Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.