Littleton Board of Health Approves Septic Variances, Continues Middlesex Street Hearing
LITTLETON — January 10, 2024 — Littleton Board of Health clears four septic variances for one failing system and sends a second back for more study. The board voted 4-0 at its January 10 meeting to approve variances allowing a new pressurized geomat leaching system at 219 Tehadawan Road, where an aging cesspool has been backing sewage into the house; engineer Kirk Fitzpatrick of Civil Solutions received approval to reduce the groundwater offset from four to three feet, use a sieve analysis in place of a percolation test, allow less than 12-inch tank inlet-outlet separation above groundwater, and place fill within 10 feet of the property line. A second hearing, for 18 Middlesex Street, was continued 4-0 to January 24 after members Kevin Baker, Kevin Davis, and Matt Wason pressed engineer Chris Stoddard to demonstrate whether secondary wastewater treatment could fit on the sub-two-tenths-of-an-acre lot before the board would consider a two-foot groundwater offset reduction. Board member Wason's infectious-disease update showed 11 local COVID cases in the past week, MWRA wastewater indicators "launching straight up," and only 28.5 percent of Littleton residents vaccinated for the current COVID season.
Keep reading with a 14-day free trial
Subscribe to The Littleton MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news