Littleton Conservation Commission Issues Order of Conditions for Mill Road Battery Storage
LITTLETON — November 4, 2025 — Littleton Conservation Commission clears battery storage project near Beaver Brook on a 5-0-1 vote. The commission voted Tuesday to close the public hearing and issue an order of conditions for a Littleton Electric Light and Water Department electrical equipment area at 97 and 99 Mill Road, DEP file 204-1022, with conditions requiring annual joint fire department training and weekly written construction updates. Commissioner Jason Carberry said the findings must explicitly reflect the public nature of the utility: "By virtue of a public agency working with the public fire department, there are certain checks and longevity commitments that are baked into that." A revised containment plan showed 28,000 gallons of secondary containment capacity, up from 12,500 gallons in the prior submission, after the engineering firm Warren Cameron corrected calculations to include the full liner footprint beneath the concrete pads. Chair Sarah Seyfried abstained due to missing a prior meeting. A separate public commenter, Jerry Cavallo, urged the commission to consider establishing public fishing access along the Beaver Brook stretch near the site, citing a state Department of Fisheries survey documenting year-round trout — a discussion deferred to a future meeting.
Keep reading with a 14-day free trial
Subscribe to The Littleton MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news